Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /opt/bitnami/wordpress/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the relevanssi domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /opt/bitnami/wordpress/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-migrate-db domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /opt/bitnami/wordpress/wp-includes/functions.php on line 6121
Trent River Bridge Replacement - North Carolina Railroad Company

Overview

Between 2012 and early 2016 NCRR, in partnership with Norfolk Southern, improved the railroad bridge over the Trent River in New Bern. The project, completed in three phases, included reinforcing the steel pipe piles, replacing the bridge deck ties and draw span lift rails, and replacing pile bents.

Notable Statistics

3

Total Cost

1.5

NCRR Investment

2016

Completion Date